A wide river bend seen from a forested bluff top, with morning fog on the water, layered limestone in the bluff face and bottomland along the bend.
Floyd County, Indiana County building department

Barndominium Builders in Floyd County, Indiana

We build barndominiums in Floyd County, Indiana, on the Louisville metro's Indiana side: post-frame and pole barn homes, steel-frame barndos, shouses, kit packages and turnkey builds on acreage around Floyds Knobs, Georgetown and Greenville. Outside New Albany, the Floyd County Department of Building & Development Services issues the residential permit and the Floyd County Plan Commission administers zoning. Start with the short survey and we will line up the permit package for your lot.

  • We assemble the Floyd County permit checklist: septic permit, site plan, drawings
  • Footings to 24 inches and a 20 psf ground snow load under the state table for Floyd County
  • Builds on the smaller acreage typical of Floyd County
  • Kits, shell packages or turnkey builds

Floyd County at a glance

County
Floyd County
Population (2025)
82,153
Residential permits
Floyd County Department of Building & Development Services, 2524 Corydon Pike, New Albany
ZIP codes
47150, 47119, 47122, 47124
Get a quote for your parcel

Barndominium services in Floyd County

Kits, shells and turnkey builds for Floyd County parcels. We price against your land rather than a rate card.

Floyd County build facts

The local facts that shape a barndominium budget and schedule in Floyd County, each with its source.

Permits, land & local facts

County building department Climate zone 4A

Residential permits: Floyd County Department of Building & Development Services, 2524 Corydon Pike, New Albany

Minimum footing depth
24 inches

Floyd County row, state code table (675 IAC 14-4.4, Table R301.2(1))

Ground snow load
20 psf

Floyd County row, state code table (675 IAC 14-4.4, Table R301.2(1))

Who issues your building permit
The Floyd County Department of Building & Development Services on Corydon Pike in New Albany reviews and issues residential building permits for the county; it asks for 5 to 7 business days for review.

Source: in.gov

What a new-home permit needs
Floyd County's checklist requires a septic permit or sewer tap-in receipt for a new dwelling, and a site plan from an Indiana-licensed surveyor or engineer.

Source: in.gov

Zoning
The Floyd County Plan Commission administers and enforces the county zoning ordinance and reviews residential developments.

Source: in.gov

Septic first
The Floyd County Health Department issues permits and inspections for new residential onsite sewage systems under 410 IAC 6-8.3 and local ordinance.

Source: in.gov

Footing depth and snow load
The state table (675 IAC 14-4.4, Table R301.2(1)) sets a 24-inch minimum footing depth, a 20 psf ground snow load and Seismic Design Category B for Floyd County.

Source: law.cornell.edu

Small parcels
The 2022 Census of Agriculture counted 257 farms in Floyd County with an average size of 65 acres, and about 176 of them under 50 acres.

Source: nass.usda.gov

Building a barndominium in Floyd County: permits & land

Indiana's statewide residential code is the 2020 Indiana Residential Code (675 IAC 14-4.4), based on the 2018 International Residential Code. Building permits and inspections for houses are issued locally, by the city, town or county, not by the state. So for a parcel in Floyd County the questions are who issues the building permit, who issues the zoning permit, and who approves the septic system.

Who issues the permit

Floyd County Department of Building & Development Services, 2524 Corydon Pike, New Albany. Permits and inspects new homes in unincorporated Floyd County; any structure of 120 square feet or more needs a permit. The City of New Albany runs its own permits.

Zoning and land

Floyd County Plan Commission. Administers and enforces the county zoning ordinance; the building permit checklist also calls for a site plan showing property lines and streets.

Septic and well

Floyd County Health Department, Environmental Health. A certified soil scientist tests the site, the department approves it, and the septic permit must be in hand before the county building permit for a new dwelling.

Design figures

Have land in or near Floyd County? Send us the parcel and we will map the permit path and price the build.

Where we build around Floyd County

The Floyd County service area, including the rural acreage outside the built-up edge, which is where the parcels big enough for a build like this usually sit. The map marks the territory we build in. It is not a branch location, and there is no office at this pin.

Barndominium builders near Floyd County

Nearby areas we build in. The permit office, zoning and septic authority can change at a city or county line.

Building in Floyd County: common questions

4 questions we get asked most often about building in Floyd County. If yours is not on the list, ask it directly.

Do you build barndominiums in Floyd County near New Albany?
Yes. We build across Floyd County and in neighbouring Clark and Harrison counties on the Indiana side of the Louisville metro. Send us your lot through our project survey.
What do I need for a barndominium building permit in Floyd County?
Floyd County Building & Development Services wants a complete application, a septic permit or sewer tap-in receipt, a site plan prepared by an Indiana-licensed surveyor or engineer, and your construction drawings. We help assemble the package.
How much does a barndominium cost in Floyd County?
It turns on size, frame, finishes and site work, and hillside lots can add foundation and driveway costs. See /guides/barndominium-cost/ for published figures; we quote once we know your site and plan.
How long does the Floyd County permit review take?
The county asks applicants to allow 5 to 7 business days once a complete application is in. The septic permit has to come first, so we start the soil work early.

Ready to build in Floyd County?

Tell us about your land and the home you want. We will come back with a plan, a permit path for your parcel and a price to build it.